Graphic Design / Frontend Development

  • Position zu besetzen ab 19. September 2022
  • Permanent-ID OCR-FL-1990
  • Branche Pharma
  • Beschäftigungsform Freelance/ Contracting
  • Standort 8x
  • Kategorien Freelance/Contracting, Pharma

Tasks Description:

The aim of this project is to define and illustrate a transparent end-toend-process for
RWE initiatives with clear responsibilities that is aligned with all stakeholders taking into
account known SOPs. We already finished the content wise definition of the process
and use it as an interim version. This version consists of Powerpoint slides, a Mural board
and Excel tables. Now we need a graphical design that is user friendly and supports
the knowledge dissemination. With that we want to establish a web-based tool for
process support for RWE studies that guides through the process flow, provides an
overview of roles & responsibilities and that fits the needs of the different personas.

Tasks:
• Graphical Design for visualization to ensure the process is user friendly, easy to
understand, clearly outlined and supports knowledge upskilling (according to
our requirements)
• Design for the process overview
• Design for the process workflow incl. Responsibilities
• Propose different design possibilities and recommend design elements
• Consult and align with project team
• Web development
• Build a web-based tool (according to our requirements)
• Functionality tests of the tool
• Support integration in MSD system landscape
• Plan for maintenance (regular updates)

Required knowledge:
• Experience as frontend developer
• Knowledge in Web-Design
• Experience working with image editing software

 

Subgoals of the project:
• Onboarding Develop process understanding and grasp needs of user groups
• Graphical design Visualization for the E2E tool aligned with project team
• Web development Build a web-based tool to outline the E2E process
• Test Functionalty test complete and functionality ensured
• Integration Integrate the webbased tool in MSDs system landscape
• Maintenance Ensure maintenance

Additional Information:
Project start: 19.09.2022
Project duration: 4 months
Remote share: tbd.
Workload: 4-5 days/week

PDF herunterladen